Shower room installation step, see you are expert

Before installing shower room, want to look at the size of toilet first, design shower room according to toilet area size area. After determining the size, the foundation will be installed and the black foundation will not be dirty.

p201707171500504618611.jpg

1. Dimensions

Before installing shower room, want to look at the size of toilet first, design shower room according to toilet area size area. After determining the size, the foundation will be installed and the black foundation will not be dirty.

2. Fixed framework

After the shower room size is good, after making a mark, can begin to perforate fixed frame on the wall.

3. Screw fixation

4. Install the tempered glass wall

After fixing the frame, it is to install the 6 per cent steel glass wall, which is to use two U - shaped slot in the top and bottom of the glass, the card is on the aluminum alloy frame.

5. Install glass doors

Installed double curved shower door open, this is in the upper two rounds of crane rail installation in the aluminum alloy frame, each fitted with a stopper on both left and right, anti-collision bead can, see figure: the right of the two is hanging wheel, on the left side of the transparent is stop anti-collision beads!

6. Install the handle

The handle design has the corresponding screw hole, only screw with screwdriver to open.

7. Waterproofing

The next part of the waterproof shower room is l-shaped in the aluminum alloy frame. The general shower room is designed with u-shaped design. In this way, it usually takes a loop of water after cooling, and cleaning is also troublesome! L type of water has its own flow, do not need to clean up at all, is lazy person design ah!